Main dedication to the electromechanical assembly of steel wind farms
For more than 5 years, TRANSBIAGA has added the assembly of wind turbines to it’s crane and transport services, offering a complete service package to it’s clients and having access to turnkey contratation model for steel tower wind turbines, but specially for concrete tower turbines, becoming a world reference in the sector.
TRANSBIAGA stands out in it’s human quality, where the non-stop work and humility are the identity signs since the origins, and currently pushes to lead up to 150 people projects.
TRANSBIAGA is nowadays world leader in the assembly of concrete tower wind turbines, with more than 500 turbines erected, up to 120m high. And together with the large experience with cranes and transports, has achieved and unquestionable efficiency in the assembly of this type of towers, helping and cooperating also with our customers in the development of the turbines.
TRANSBIAGA is also one of the references in the electromechanical assembly of wind turbines, with highly specialized and qualified crew.
Among others, its client portfolio includes the following companies:
- Siemens-Gamesa
- Acciona Energia
- Nordex-Acciona Windpower
- Iberdrola
- Vestas
- General Electric
Projects in 2023:
- Wind farm assembly: San Juan de Marcona, San Juan de Marcona, Región de Ica, Perú. 23 WTG N163-5.7 TS148m. Acciona Energía
Projects in 2022:
- Wind farm assembly: El Campillo, Campillo de Altobuey, Cuenca, España. 54 WTG N155/4500 TC120N. Nordex Energy
- Wind farm assembly: Los Cañones, La Noria de la Sabina, Coahuila, México. 20 WTG N155/4500 TC120N. Nordex Energy
- Wind farm assembly: Puelche Sur, Frutillar, Los Lagos, Chile. 33 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Mesamávida, Mulchén, Bío-Bío, Chile. 14 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Gecama, Honrubia, Cuenca, España. 69 WTG N149/4500 TC120N. Nordex Energy
Projects in 2021:
- Wind farm assembly: Los Cañones, La Noria de la Sabina, Coahuila, México. 20 WTG N155/4500 TC120N. Nordex Energy
- Wind farm disassembling: Parque Eólico Punta Lima, Naguabo, Puerto Rico. 13 WTG V100-1.8 HH80m. Vestas
- Wind farm assembly: Puelche Sur, Frutillar, Los Lagos, Chile. 33 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Mesamávida, Mulchén, Bío-Bío, Chile. 14 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Sierra Juárez, Tecate, Baja California. México. 26 WTG V150-4.2 HH105m Vestas
- Wind farm assembly: Gecama, Honrubia, Cuenca, España. 69 WTG N149/4500 TC120N Nordex Energy
- Wind farm assembly: Los Olmos, Mulchén, Bío-Bío, Chile. 23 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Alena, Mulchén, Bío-Bío, Chile. 18 WTG N149/4800 TS145. Nordex Energy
- Wind farm assembly: Coromuel, La Paz, Baja California Sur, México. 20 WTG GE 2.5-127 90m HH. General Electric
- Wind farm assembly: Barrax y Chinchilla, Barrax y Pozo Cañada, Albacete, España. 22 WTG AW140/3000 TH120m. Nordex Energy
- Wind farm assembly: Mesa Morenos, Los Pinos, Zacatecas, México. 22 WTG AW148/3300 TH120m. Nordex Energy
- Wind farm assembly: Ventus, Metapán, El Salvador. 15 WTG V136 HH120m. Vestas
- Wind farm assembly: San Carlos, Guadalupe de San Lázaro, Tamaulipas, México. 60 WTG AW132/3300. Acciona Energía
- Wind farm assembly: Reloj del Sol, San Ygnacio, Texas, Estados Unidos. 63 WTG AW132/3300 TH120m. Nordex Energy
Projects in 2020:
- Wind farm assembly: Coromuel, La Paz, Baja California Sur, México. 20 WTG GE 2.5-127 90m HH. General Electric
- Wind farm assembly: Barrax y Chinchilla, Barrax y Pozo Cañada, Albacete, España. 22 WTG AW140/3000 TH120m. Nordex Energy
- Wind farm assembly: Mesa Morenos, Los Pinos, Zacatecas, México. 22 WTG AW148/3300 TH120m. Nordex Energy
- Wind farm assembly: Ventus, Metapán, El Salvador. 15 WTG V136 HH120m. Vestas
- Wind farm assembly: San Carlos, Guadalupe de San Lázaro, Tamaulipas, México. 60 WTG AW132/3300. Acciona Energía
- Wind farm assembly: Reloj del Sol, San Ygnacio, Texas, Estados Unidos. 63 WTG AW132/3300 TH120m. Nordex Energy
- Wind farm assembly: Ablitas y Cabanillas II, Ablitas y Cabanillas, Navarra, España. 28 WTG AW132/3465 TH120m. Nordex Energy
- Wind farm assembly: Santa Cruz, Reynosa, Tamaulipas, Mexico. 42 WTG AW132/3300 TH120m. Acciona Energía
- Wind farm assembly: Tolpán Sur, Renaico, La Araucanía, Chile. 28 WTG AW132/3000 TH120m. Acciona Energía
- Supervision and assembly of Mulanur wind farm, Tamil Nadu, India. 100 WTG AW140/3000 TH120m. Nordex Energy
- Wind farm assembly: Dolores, China, Nuevo León, Mexico. 83 WTG AW132/3000 TH120m. Nordex Energy.
- Montaje Parque Eólico Clúster Mudarra, La Mudarra, Valladolid, España. 42 WTG AW132/3150 TV120m + 1 WTG AW132/3150 TA84m. Nordex Energy.
Previous projects:
Projects in 2019:
- Wind farm assembly: Santa Cruz, Reynosa, Tamaulipas, Mexico. 42 WTG AW132/3300 TH120m. Acciona Energía
- Wind farm assembly: Tolpán, Renaico, La Araucanía, Chile. 28 WTG AW132/3000 TH120m. Acciona Energía
- Supervision and assembly of Mulanur Wind farm, Tamil Nadu, India. 100 WTG AW140/3000 TH120m. Nordex Energy
- Supervision and assembly of Dolores Wind farm, China, Nuevo León, Mexico. 83 WTG AW132/3000 TH120m. Nordex Energy.
- Wind farm assembly: Clúster Mudarra, La Mudarra, Valladolid, España. 42 WTG AW132/3150 TV120m + 1 WTG AW132/3150 TA84m. Nordex Energy.
- Wind farm assembly: Mesa La Paz, Llera de Canales, Tamaulipas, Mexico. 85 WTG V136 3.45MW HH120m. Vestas
- Wind farm assembly: Salitrillos, Reynosa, Tamaulipas, México. 30 WTG V136 3.45MW HH112m. Vestas
- Wind farm assembly: San Gabriel, Renaico, La Araucanía, Chile. 61 WTG AW132/3000 TH120m. Acciona Energía
2018:
- Wind farm assembly: Salitrillos, Reynosa, Tamaulipas, México. 30 WTG V136 3.45MW HH112m. Vestas
- Wind farm assembly: San Gabriel, Renaico, La Araucanía, Chile. 61 WTG AW132/3000 TH120m. Acciona Energía
- Wind farm assembly: La Amistad I, Ciudad Acuña, Coahuila, México. 57 WTG G132 T84m. Siemens-Gamesa
- Wind farm assembly: Eólica del Sur, Juchitán de Zaragoza, Oaxaca, México. 132 WTG V90 3.0MW HH78m. Vestas
- Wind farm assembly: Cortijo, Reynosa, Tamaulipas, Mexico. 61 WTG AW125/3000 TH120m, Acciona Energía
- Wind farm assembly: Wayra I, Nazca, Perú. 41 WTG AW125/3000 TA87,5m, Nordex-Acciona Windpower
- Wind farm assembly: Las Cumbres, Guatemala. 15 WTG G114, Siemens-Gamesa
2017:
- Wind farm assembly: Las Cumbres, Guatemala. 15 WTG G114, Siemens-Gamesa
- Wind farm assembly: Wayra I, Nazca, Perú. 41 WTG AW125/3000 TA87,5m, Nordex-Acciona Windpower
- Wind farm assembly: Cortijo, Reynosa, Tamaulipas, Mexico. 61 WTG AW125/3000 TH120m, Acciona Energia
- Montaje Prototipo Postensa, La Ventosa, Oaxaca Mexico. 1 WTG G9X Torre Hormigón 100m, Postensa-Gamesa.
- Wind farm assembly: San Jacinto, Chiapas, Mexico. 10 WTG G9X, Siemens-Gamesa
- Wind farm assembly: La Bufa, Zacatecas, México. 64 WTG G114, Siemens-Gamesa
- Supervisión y Wind farm assembly: Bannur, India 24 WTG AW125/3000 TH120m, Acciona Energia
2016:
- Wind farm assembly: San Román, Texas, USA. 31 WTG AW125/3000 TA87,5m, Acciona Energy
- Wind farm assembly: Vientos del Altiplano, Mahoma, Zacatecas, México. 50 WTG G114 2.0MW T93m. Siemens-Gamesa
- Wind farm assembly: Palo Alto, Ojuelos, Jalisco, Mexico. 42 WTG AW125/3000 TA87,5m, Nordex-Acciona Windpower
- Wind farm assembly: Ventika, Nuevo León, México. 84 WTG AW125/3000 TH120, Acciona Energía
- Wind farm assembly: Valentines, Uruguay. 35 WTG G114 T93m. Siemens-Gamesa