English  

Central delegation

(+34) 943 80 53 53

Administration

(+34) 943 80 53 54


 

More than 25 years ago, TRANSBIAGA took its first steps with self-propelled mobile cranes, initially to complement its transport activity by including movement and assembly of the elements it transported. TRANSBIAGA has a large and modern fleet of mobile cranes, all by the best makers in the market, handled by an expert team of operators, all duly trained and approved and who go about their activity in numerous countries.

Today the fundamental activity at TRANSBIAGA GRÚAS focuses on the wind sector, with the aim of offering clients a safe and complete assembly and hoisting service as follow-up to transport of the wind tower components. To complete this integral service, we have developed a section specialising in the maintenance of wind turbines following their installation. We can therefore offer our clients, technologists, our wind farm assembly and subsequent management services.

TRANSBIAGA’s large and varied fleet of mobile cranes means that it can work with different kinds of wind towers and with components by the different technologists. We have units ranging from 100t to 1200 t of load capacity, always fitted with the latest features introduced by their manufacturers, such as the LIEBHERR LTM 11200 narrow track crawler with its telescopic boom of 100m.All of this, with lifting equipment permitting us to attain heights of 70, 90 and more than 100 metres, means that we have the ability to hoist and assemble the entire range of wind towers existing on the market.

 

Note that TRANSBIAGA has the lifting equipment with the world’s highest aerial platform, at 101 metres, made by BRONTO.

  • BRONTO SKYLIFT 70m
  • BRONTO SKYLIFT 90m
  • BRONTO SKYLIFT 101m

TRANSBIAGA GRÚAS is an international benchmark in lifting wind farm components, not to mention the complete transport, unloading, lifting, tower assembly, electromechanical assembly and turbine maintenance service that sets TRANSBIAGA apart from any other company in the market.

 

Projects in 2023:

  • Wind farm assembly: Punta de Talca, Ovalle, Coquimbo, Chile. 14 WTG N155-5.7 TS105m. Nordex Energy
  • Wind farm assembly: San Juan de Marcona, San Juan de Marcona, Región de Ica, Perú. 23 WTG N163-5.7 TS148m. Acciona Energía
  • Wind farm assembly: Wayra Extensión, Nazca, Región de Ica, Perú. 30 WTG N155-5.7 TS105m. Nordex Energy
  • Wind farm assembly: Punta Lomitas, Ocucaje, Región de Ica, Perú. 50 WTG SG5.0-145 T90m. Siemens-Gamesa
  • Wind farm assembly: Torsa, Litueche, O’Higgins, Chile. 19 WTG N163-5.8 TS148m. Nordex Energy
  • Wind farm assembly: Atacama, Freirina, Atacama, Chile. 29 WTG N163-5.8 TS105m. Nordex EnergyWayra Extensión, Nazca, Región de Ica, Perú. 30 WTG N155-5.7 TS105m. Nordex Energy

Projects in 2022:

  • Wind farm assembly: Wayra Extensión, Nazca, Región de Ica, Perú. 30 WTG N155-5.7 TS105m. Nordex Energy
  • Wind farm assembly: Punta Lomitas, Ocucaje, Región de Ica, Perú. 50 WTG SG5.0-145 T90m. Siemens-Gamesa
  • Wind farm assembly: Torsa, Litueche, O’Higgins, Chile. 19 WTG N163-5.8 TS148m. Nordex Energy
  • Wind farm assembly: Atacama, Freirina, Atacama, Chile. 29 WTG N163-5.8 TS105m. Nordex Energy
  • Wind farm assembly: Hocksjön, Ramsele, Västernorrlands län, Suecia. 23 WTG N163-5.8 TS148m. Nordex Energy
  • Wind farm assembly: El Campillo, Campillo de Altobuey, Cuenca, España. 54 WTG N155/4500 TC120N. Nordex Energy
  • Wind farm assembly: Skaftaasen, Sveg, Suecia. 35 WTG SG5.X-155 T102,5m. Siemens-Gamesa
  • Wind farm assembly: Los Cañones, La Noria de la Sabina, Coahuila, México. 20 WTG N155/4500 TC120N. Nordex Energy
  • Wind farm assembly: Puelche Sur, Frutillar, Los Lagos, Chile. 33 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Mesamávida, Mulchén, Bío-Bío, Chile. 14 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Gecama, Honrubia, Cuenca, España. 69 WTG N149/4500 TC120N Nordex Energy

Projects in 2021:

  • Wind farm assembly: Skaftaasen, Sveg, Suecia. 35 WTG SG5.X-155 T102,5m
  • Wind farm assembly: Los Cañones, La Noria de la Sabina, Coahuila, México. 20 WTG N155/4500 TC120N. Nordex Energy
  • Wind farm disasembly: Punta Lima, Naguabo, Puerto Rico. 13 WTG V100-1.8 HH80m. Vestas
  • Wind farm assembly: Puelche Sur, Frutillar, Los Lagos, Chile. 33 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Mesamávida, Mulchén, Bío-Bío, Chile. 14 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Sierra Juárez, Tecate, Baja California. México. 26 WTG V150-4.2 HH105m Vestas
  • Wind farm assembly: Gecama, Honrubia, Cuenca, España. 69 WTG N149/4500 TC120N Nordex Energy
  • Wind farm assembly: Åndberg, Lillhärdal, Härjedalen, Suecia. 53 WTG N149/5000 TS105m
  • Wind farm assembly: Toabré, Penonomé, Panamá. 20 WTG V117-3.6MW HH84m. Vestas
  • Wind farm assembly: La Estrella, O’Higgins, Chile. 11 WTG SG145-4.5 T127. Siemens-Gamesa
  • Wind farm assembly: Los Olmos, Mulchén, Bío-Bío, Chile. 23 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Alena, Mulchén, Bío-Bío, Chile. 18 WTG N149/4800 TS145. Nordex Energy
  • Wind farm assembly: Coromuel, La Paz, Baja California Sur, México. 20 WTG GE 2.5-127 90m HH. General Electric
  • Wind farm assembly: Barrax y Chinchilla, Barrax y Pozo Cañada, Albacete, España. 22 WTG AW140/3000 TH120m. Nordex Energy
  • Wind farm assembly: Mesa Morenos, Los Pinos, Zacatecas, México. 22 WTG AW148/3300 TH120m. Nordex Energy
  • Wind farm assembly: Ventus, Metapán, El Salvador. 15 WTG V136 HH120m. Vestas
  • Wind farm assembly: San Carlos, Guadalupe de San Lázaro, Tamaulipas, México. 60 WTG AW132/3300. Acciona Energía
  • Wind farm assembly: Reloj del Sol, San Ygnacio, Texas, Estados Unidos. 63 WTG AW132/3300 TH120m. Nordex Energy

 

Previous projects:

Projects in 2020:

  • Wind farm assembly: Coromuel, La Paz, Baja California Sur, México. 20 WTG GE 2.5-127 90m HH. General Electric
  • Wind farm assembly: Barrax y Chinchilla, Barrax y Pozo Cañada, Albacete, España. 22 WTG AW140/3000 TH120m. Nordex Energy
  • Wind farm assembly: Mesa Morenos, Los Pinos, Zacatecas, México. 22 WTG AW148/3300 TH120m. Nordex Energy
  • Wind farm assembly: Santa Cruz, Reynosa, Tamaulipas, Mexico. 42 WTG AW132/3300 TH120m. Acciona Energía
  • Wind farm assembly: Tolpán, Renaico, La Araucanía, Chile. 28 WTG AW132/3000 TH120m. Acciona Energía
  • Wind farm assembly: La Amistad III, Ciudad Acuña, Coahuila, Mexico, 24 WTG SG145 T107,5m. Siemens-Gamesa
  • Wind farm assembly: Vientos Neuquinos, Bajada Colorada, Neuquén, Argentina. 29 WTG AW132/3465 TH120m. Nordex En

 

Projects in 2019:

  • Wind farm assembly: Santa Cruz, Reynosa, Tamaulipas, Mexico. 42 WTG AW132/3300 TH120m. Acciona Energía
  • Wind farm assembly: Tolpán, Renaico, La Araucanía, Chile. 28 WTG AW132/3000 TH120m. Acciona Energía
  • Wind farm assembly: La Amistad III, Ciudad Acuña, Coahuila, Mexico, 24 WTG SG145 T107,5m. Siemens-Gamesa
  • Wind farm assembly: Vientos Neuquinos, Bajada Colorada, Neuquén, Argentina. 29 WTG AW132/3465 TH120m. Nordex Energy
  • Wind farm assembly:  Chubut Norte, Puerto Madryn, Chubut, Argentina. 38 WTG N149/4000 TH120-2. Nordex Energy.
  • Wind farm assembly:  Nxuba, Cookhouse, Western Cape, Sudáfrica. 47 WTG AW125/3000 TH100m. Nordex Energy.
  • Wind farm assembly:  Tres Picos, Choele-Choel, Río Negro, Argentina. 30 WTG AW132/3000 TH120m. Nordex Energy.
  • Wind farm assembly:  Araúco I y II, Aimogasta, La Rioja, Argentina. 38 WTG G114 T80m, Siemens-Gamesa
  • Wind farm assembly:  Guzmancitos, Puerto Plata, República Dominicana. 16 WTG V136 3.45MW HH132m. Vestas.
  • Wind farm assembly:  La Amistad II, Ciudad Acuña, Coahuila, México. 29 WTG G132 T114m. Siemens-Gamesa.
  • Wind farm assembly:  Dolores, China, Nuevo León, Mexico. 83 WTG AW132/3000 TH120m. Nordex Energy.
  • Wind farm assembly:  Guanillo, Monte Cristi, República Dominicana. 25 WTG G114 T80m. Siemens-Gamesa
  • Wind farm assembly:  Agua Clara, Monte Cristi, República Dominicana. 25 WTG G114 T93m. Siemens-Gamesa
  • Wind farm assembly:  Tizimín, Tizimín, Yucatán, México. 36 WTG G114 T125m. Siemens-Gamesa
  • Wind farm assembly: Clúster Navarra, Barasoain, Navarra, España. 15 WTG AW132/3150 TV120m. Nordex Energy.
  • Wind farm assembly: Clúster Mudarra, La Mudarra, Valladolid, España. 42 WTG AW132/3150 TV120m + 1 WTG AW132/3150 TA84m. Nordex Energy.
  • Wind farm assembly: Mesa La Paz, Llera de Canales, Tamaulipas, Mexico. 85 WTG V136 3.45MW HH120m. Vestas
  • Wind farm assembly: Pomona, Pomona, Río Negro, Argentina. 29 WTG N131/3900 T120m. Nordex Energy
  • Wind farm assembly: San Gabriel, Renaico, La Araucanía, Chile. 61 WTG AW132/3000 TH120m. Acciona Energía
  • Wind farm assembly: Reynosa, Reynosa, Tamaulipas, México. 123 WTG V136 3.45MW HH120m. Vestas
 

Projects in 2018:

  • Wind farm assembly: Pomona, Pomona, Río Negro, Argentina. 29 WTG N131/3900 T120m. Nordex-Acciona Windpower
  • Wind farm assembly: Guanillo, Monte Cristi, República Dominicana. 25 WTG G114 T80m. Siemens-Gamesa
  • Wind farm assembly: Agua Clara, Monte Cristi, República Dominicana. 25 WTG G114 T93m. Siemens-Gamesa
  • Wind farm assembly: Salitrillos, Reynosa, Tamaulipas, México. 30 WTG V136 3.45MW. Vestas
  • Wind farm assembly: San Gabriel, Renaico, La Araucanía, Chile. 61 WTG TH120m AW3000. Acciona Energía
  • Wind farm Eólica del Sur, Juchitán de Zaragoza, Oaxaca, México. 132 WTG V90 3.0MW T78m. Vestas
  • Wind farm La Amistad I, Ciudad Acuña, Coahuila, México. 57 WTG G132 T84m. Siemens-Gamesa
  • Wind farm Tizimín, Tizimín, Yucatán, México. 36 WTG G114 T125m. Siemens-Gamesa
  • Wind farm Reynosa, Reynosa, Tamaulipas, México. 123 WTG V136 3.45MW T120m. Vestas
  • Wind farm Larimar II, Enriquillo, Barahona, República Dominicana. 14 WTG V117 3.3MW T91,5m. Vestas
  • Wind farm Araúco I y II, Aimogasta, La Rioja, Argentina. 38 WTG G114 T80m, Siemens-Gamesa
  • Wind farm La Castellana, Bahía Blanca, Argentina. 32 WTG TA 92m AW3000, Nordex-Acciona Windpower
  • Wind farm Achiras, Achiras, Córdoba, Argentina. 15 WTG TA 92m AW3000, Nordex-Acciona Windpower
  • Wind farm Cabo Leones, Chañoral, Huasco, Chile. 55 WTG G114 T80m. Siemens-Gamesa
  • Wind farm Las Cumbres, Agua Clara, Guatemala. 15 WTG G114, Siemens-Gamesa
  • Wind farm Wayra I, Nazca, Perú. 41 WTG TA 87,5m AW3000, Nordex-Acciona Windpower
  • Wind farm Cortijo, Reynosa, Tamaulipas, Mexico. 61 WTG TH120m AW3000, Acciona Energía

 
Projects in 2017:

  • Wind farm El Boyal III, Borja, Zaragoza, España. 1 WTG G114 T156m. Siemens-Gamesa
  • Wind farm Las Cumbres, Agua Clara, Guatemala. 15 WTG G114, Siemens-Gamesa
  • Wind farm Wayra I, Nazca, Perú. 41 WTG TA 87,5m AW3000, Nordex-Acciona Windpower
  • Wind farm Cortijo, Reynosa, Tamaulipas, Mexico. 61 WTG TH120m AW3000, Acciona Energia
  • Prtotoype Postensa, La Ventosa, Oaxaca Mexico. 1 WTG G9X Torre Hormigón 100m, Postensa-Gamesa.
  • Wind farm San Jacinto, Arriaga, Chiapas, Mexico. 10 WTG G114, Siemens-Gamesa
  • Wind farm La Bufa, Zacatecas, Zacatecas, México. 64 WTG G114, Siemens-Gamesa
  • Wind farm Colonia Arias, San Gregorio, Uruguay. 35 WTG G114 T93m. Siemens-Gamesa
  • Wind farm Sierra Gorda, Sierra Gorda, Antofagasta, Chile. 56 WTG G114 T93m. Siemens-Gamesa

 
Projects in 2016:

  • Prtotoype Gestamp, Becerril de Campos, Palencia, España. 1 WTG V110 Torre Hormigón Gestamp 110m. Gestamp-Vestas
  • Wind farm Moulin de Tizon, Moulin de Tizon, Francia. 6 WTG G9X T90m. Siemens-Gamesa.
  • Wind farm Pasilly, Pasilly, Francia. 10 WTG G9X T90m. Siemens-Gamesa
  • Wind farm Palo Alto, Ojuelos de Jalisco, Jalisco, México. 43 WTG TA 87,5m AW3000, Nordex-Acciona Windpower
  • Wind farm Vientos del Altiplano, Mahoma, Zacatecas, México. 50 WTG G114 2.0MW T93,1m. Siemens-Gamesa
  • Wind farm San Román, Brownsville, Texas, EE.UU. 31 WTG TA 87,5m AW3000. Acciona Energy
  • Wind farm Peñoles, Saltillo, Coahuila, México. 13 WTG G114 2.0MW, Siemens-Gamesa
  • Wind farm Ventika, Nuevo León, México. 84 WTG TH120m AW3000, Acciona Energía
  • Wind farm Vientos Azules, Tilarán, Costa Rica. 9 WTG G9X T78m + 1 WTG G8X T78m. Siemens-Gamesa
  • Wind farm Altamira, Tilarán, Costa Rica. 10 WTG G9X T78m. Siemens-Gamesa
  • Wind farm La Perla, Quebrada Grande, Liberia, Costa Rica. 10 WTG G8X T78m + 5 WTG G8X T90m. Siemens-Gamesa
  • Wind farm Miramar, Quebrada Grande, Liberia, Costa Rica. 5 WTG G8X T78m + 5 WTG G8X T90m. Siemens-Gamesa
  • Wind farm Las Peñas, Arauco, La Araucanía, Chile. 4 WTG G114 T93m. Siemens-Gamesa
  • Wind farm Maldonado II, San Carlos, Uruguay. 25 WTG G114 T80m. Siemens-Gamesa
  • Wind farm Valentines, Valentines, Uruguay. 35 WTG G114 T93m. Siemens-Gamesa
  • Wind farm Larimar I, Enriquillo, Barahona, República Dominicana. 15 WTG V112 3.0MW T84m. Vestas