Transbiaga starts the Barrax and Chinchilla (Albacete) wind farms 2020/10/14

Transbiaga starts the Barrax and Chinchilla (Albacete) wind farms. In May, the execution of this work began, which will consist of 13 and 9 AW 3000 TH-120 / TH-140 wind turbines and a total generation of 39.90 MW and 27.30 MW.
The wind turbines will be installed on concrete towers with a hub height of 120 m, and delivery is scheduled for the second half of 2020.